Yacht wheelhouse helm station behind large panoramic glazing on the open ocean

Marine

Modeled: wheelhouse refit, 55 m motor yacht

North Atlantic charter scenario — 24 glazed lites re-set into the launch-day rebates

Modeled scenario using THERMGLASS calculators — not a completed installation. Figures are calculation-derived; see the outcome note at the end of this page.

Share

The Problem

A vessel running North Atlantic charter seasons sees the same pattern every cold month: wheelhouse glass hazing over within minutes of leaving the lee of the land. Single-pane original glazing runs no meaningful margin between cabin dew point and glass surface temperature, so the watch fought a losing cycle of wiping, streaks, and salt-haze scatter after dark.

The humidity load aboard a vessel like this is severe. Twelve guests and eight crew mean galleys steaming through every service, showers running, wet gear drying in the passageway, and sealed living spaces adding moisture around the clock. Cabin relative humidity sits in the 60–70% band through the heating season — conditions that fog windows a building would never see, against glass chilled by seawater on its far side.

The refit constraints are just as defining. Frames were engineered around the glass fitted at launch and the wheelhouse structure was not available for cutting. And the glass sits high in the superstructure, where every added kilogram spends stability margin instead of banking it.

The Solution

The refit re-glazes twenty-four wheelhouse and saloon lites with 6.3 mm standalone vacuum insulated glass units — two 3 mm lites around a hairline evacuated gap. Because the glass-frit edge seal is fused and flush and the unit is portless, the overall depth equals the glass stack itself, so each unit drops straight into a rebate cut for a single pane — no structural cutting, no re-framing.

The makeup carries a high-performance low-e stack, specified through the marine configurator alongside the salt-spray and vibration requirements of the service. Center-of-glass performance is calculated, not laboratory-measured: 0.46 W/m²·K (0.081 Btu/h·ft²·°F) for the published base — a figure that already includes the unit's integral low-E coating, per the EN 673 / ISO 10292 calculation basis used across this site.

With almost no gas in the cavity to carry heat across, the inner lite tracks cabin temperature instead of sea temperature — the mechanism our window-condensation guide works through number by number. The demist load shrinks with it: at the 70 °F / 0 °F design condition the modeled inner surface sits near 63 °F, only a few degrees above the ~60 °F dew point of a 70% RH cabin — a thin but real margin that would sharply cut the night-time fog-and-wipe cycle, with the demist system carrying the heaviest moisture loads.

Modeled Outcomes

Figures are modeled outputs calculated from published methodology and the THERMGLASS ROI engine — not laboratory or field measurements. Run the linked calculator for project-specific numbers.

Inner-glass surface

≈63 °F at 70 °F / 0 °F

Modeled inner-surface temperature at the published design condition — versus roughly 44 °F for single pane. At a 70% RH cabin the dew point sits near 60 °F, so the modeled margin is a few degrees: enough to sharply cut the fog cycle, not a guarantee in heavier moisture loads.

Glass mass

≈15 kg/m²

About half the glass mass of a triple-glazed unit built for comparable thermal performance — removed high in the superstructure, where stability margin is scarcest.

Glazing depth

6.3 mm

Flush, portless frit seal: overall depth equals the glass stack, so the unit fits the rebate the vessel launched with. No perimeter build-up discovered during installation.

Cabin HVAC load

≈$1,458/yr at defaults

The marine ROI engine's default scenario (60 m vessel, 30 m² of bridge glazing, mixed-global route, HVAC COP 3.0, $0.35/kWh sea-generated electricity, 280 operating days) returns ≈$1,458/yr and a ≈7.2-year payback; the linked calculator prices your vessel's area and route.

Put numbers on your project

Model the same glazing decision for your own project — dimensions, climate, and rates in, project-specific savings out.

Technical Reading

Marine

Vacuum Glass for Marine Vessels: Condensation and Weight

Bridge glass fogs from the first cold current. How vacuum glazing keeps wheelhouse glass dry and light — and what it changes for fuel and refits.

Read the guide
Marine

Vacuum Glass for EU and UK Marine Projects

Metric specs for EU and UK vessels: EN 673 and EN ISO 10077-1 values, acoustics, polar conditions, fire advisory and EUR pricing.

Read the guide
Cost & ROI

How to Calculate Vacuum Glass Payback: The Complete Guide

A step-by-step method for annual savings, simple payback and NPV, with a worked example from the THERMGLASS ROI Engine.

Read the guide
Glazing Comparison

Thermal Insulation Compared: Vacuum Glass, Triple-Pane, Low-E IGU

Side-by-side analysis of U-values, SHGC, weight, and thickness across glazing types — with data grounded in EN 673 and NFRC 100 test standards.

Read the guide
Glazing Comparison

Sound, Condensation, Payback: Vacuum Glass vs. Triple-Pane

The engine-backed verdict: vacuum glass vs. triple-pane on U-values, weight, acoustics, condensation margin, and payback at exact default inputs.

Read the guide

Specifying a similar project?

Talk to the engineering team about glazing your project.

Contact THERMGLASS