Passive House
Modeled: certification-track new build, cold-climate zone 5
Single-family spec home — the glazing package selected against PHIUS 2021 and IECC 2021 targets
Modeled scenario using THERMGLASS calculators — not a completed installation. Figures are calculation-derived; see the outcome note at the end of this page.
The Problem
In a certification-track new build, every envelope component is a certification decision — and glazing is usually the binding one. The PHIUS 2021 and IECC 2021 pathways both put a ceiling on window U-value, and the ceiling has to be met across the whole glazing schedule at once: a single bank of code-typical units drags the area-weighted performance back under the target no matter how good the rest of the package is. The design team had to pick a glazing specification the whole facade could meet, at a price the spec-home budget could survive.
The starting point was the code-typical package: double-pane low-e glass at roughly 0.30 Btu/h·ft²·°F whole-window, the level most zone 5 construction ships with. At the site's climate — IECC zone 5, about 6,300 heating degree days in the engine's zone table — that U-value feeds directly into the heating balance and into the surface-temperature math that passive-house comfort is built on: winter interior glass surfaces several degrees below room temperature, a radiant chill zone at every window, and condensation risk at the coldest corners on the design night.
The conventional answer, triple glazing, closes most of the U-value gap — but at a cost the project was trying to avoid. Triple builds run 30-plus millimetres thick, which narrows frame choices, raises per-unit cost and weight, and complicates the installation details a certification review actually inspects. On a spec home, every dollar of envelope premium competes with the rest of the build, so the glazing decision had to buy certification margin without buying a bespoke fenestration package.
The Solution
The glazing schedule specifies hybrid vacuum glazing on the main elevations — the vacuum pane paired with a conventional IGU cavity at roughly 20.3–26 mm overall, the lowest whole-window U-values in the product range. Standalone 6.3–10.3 mm units covered the secondary openings where the frame schedule was tighter. One glazing family across the whole schedule kept the area-weighted performance above target without per-elevation exceptions for the certifier to chase.
The package was modeled through the Passive House ROI engine at its default scenario — 220 sq ft of glazing, IECC zone 5 (6,300 HDD), heat-pump heating at COP 3.0, $0.16/kWh — on the ISO 10077-1 whole-window basis with a thermally-broken frame. The engine's compliance check cleared both gates for the specification: the PHIUS 2021 zone-5 glazing U-target and the IECC 2021 zone-5 maximum. That is modeled clearance against published targets — pre-certification analysis, not a certificate.
The solar-heat-gain side was specified just as deliberately. Trimming SHGC from the 0.25 baseline to 0.20 costs a little free winter heat but prices into the engine's cooling stream, which a zone 5 home with mechanical cooling still carries. And the physics that earns the certification margin also does the comfort work: with almost no gas in the vacuum gap, the inner lite sits near room temperature, so winter surface temperatures stay above the dew point and the radiant chill zone at the glass disappears — the difference occupants notice before they ever see an energy bill.
Modeled Outcomes
Figures are modeled outputs calculated from published methodology and the THERMGLASS Passive House ROI engine at its default inputs — not laboratory or field measurements, and not a passive-house certificate. Run the linked calculator with your own glazing area, climate zone, and fuel for project-specific numbers.
Whole-window Uw
≈0.13 Btu/h·ft²·°F
The engine's default VIG specification, modeled per ISO 10077-1 with a thermally-broken frame at a 20% frame fraction — pending NFRC 100/500 certification, the same conservative basis used across this site's calculators.
Annual savings
$123.43/yr
Engine output for the default scenario (heat-pump COP 3.0 applied, 2.5% energy escalation) — alongside ≈0.30 t CO₂/yr avoided at EPA eGRID factors (298 kg), ≈7.4 t over the 25-year analysis period.
Certification checks
PHIUS + IECC: clear
Modeled clearance of the PHIUS 2021 zone-5 glazing U-target and the IECC 2021 zone-5 maximum in the engine's compliance check — pre-certification modeling against published targets, not a certificate.
Simple payback
≈39 yr at defaults
$4,840 of glazing premium ($22/sq ft over 220 sq ft) against $123.43/yr at 2.5% escalation — a ≈39-year simple payback with break-even at ≈28 years and a 25-year NPV of −$2,606; the engine's honest default answer. Rebates, colder sites, and higher tariffs all move it; the linked calculator prices your project.
Put numbers on your project
Model the same glazing decision for your own project — dimensions, climate, and rates in, project-specific savings out.
Technical Reading
Vacuum Glass vs. Triple-Pane: U-Value, Weight, Cost
Vacuum glass vs. triple-pane compared: center-of-glass U-values, unit depth, weight, and installed-cost drivers — the spec-level comparison for your next project.
Read the guideWhy Vacuum Glass Stops Window Condensation
Window sweating is a surface-temperature problem. See how vacuum glazing keeps the inner pane above the dew point — even in deep-winter conditions.
Read the guideThermal Insulation Compared: Vacuum Glass, Triple-Pane, Low-E IGU
Side-by-side analysis of U-values, SHGC, weight, and thickness across glazing types — with data grounded in EN 673 and NFRC 100 test standards.
Read the guideSound, Condensation, Payback: Vacuum Glass vs. Triple-Pane
The engine-backed verdict: vacuum glass vs. triple-pane on U-values, weight, acoustics, condensation margin, and payback at exact default inputs.
Read the guideWhen Vacuum Glass Pays Back Faster Than Triple-Pane
One scenario is an anecdote. We swept climate zone, heating fuel, and installed cost through the ROI engine to map where VIG-over-triple-pane payback actually moves.