Cold Storage
Modeled: glass door retrofit, frozen-food cold store
Distribution-center retail scenario — display and walk-in doors re-glazed with VIG
Modeled scenario using THERMGLASS calculators — not a completed installation. Figures are calculation-derived; see the outcome note at the end of this page.
The Problem
The store's glass doors are its most expensive advertising surface and its worst thermal leak at the same time. Single-glazed doors sit across a permanent deep-temperature differential, so the store-side surface ran far below the aisle dew point: fog on opening hours, frost bloom overnight, and a morning wipe-down that never quite keeps up.
Heated-glass doors were fighting the symptom, not the cause — electric heat fighting condensation continuously, 365 days a year, on the same energy meter that pays the compressors. Every watt of door heat and every minute of extra compressor run-time traced straight back to heat pouring through the glass.
Merchandising suffered alongside the energy bill. Fogged and frosted glass hid the stock behind it in exactly the cases meant to sell it, and customers opened doors to see what the glass wouldn't show — dumping chilled air into the aisle and compounding the load the doors were supposed to contain.
The Solution
The refit re-glazes display and walk-in doors with vacuum insulated glass — a 0.46 W/m²·K center-of-glass calculation basis against roughly 5.8 W/m²·K for the single glass it replaced, both on the EN 673 / ISO 10292 calculation methodology used across this site.
The evacuated cavity removes the conduction path that drove the frost cycle. With the door surface held near aisle temperature instead of case temperature, the glass would hold above the aisle dew point in normal operation — visibility clears, and heated-glass duty drops from a constant fight to a residual trim load.
Door-by-door energy framing came from the refrigeration ROI engine: conduction heat gain Q = U × A × ΔT × hours, compressor energy at the case COP, priced against the store's tariff. The engine is built for exactly this decision — door count, door size, temperature zone, and hours per day in, project-specific savings out.
Modeled Outcomes
Figures are modeled outputs calculated from published methodology and the THERMGLASS ROI engine — not laboratory or field measurements. Run the linked calculator for project-specific numbers.
Center-of-glass U
0.46 vs ≈5.8 W/m²·K
Calculated center-of-glass comparison, VIG against the single glass it replaced (EN 673 / ISO 10292 basis) — roughly a 12× improvement at the glass.
Conductive heat gain
≈92% lower per m²
Modeled from the door U-ratio at equal area and ΔT — the conductive component of door heat gain, before any heated-glass offset is counted.
Door surface temp
Above aisle dew point
Modeled for typical aisle conditions: the store-side surface holds near aisle temperature, clearing the fog-and-frost cycle at its source rather than fighting it.
Compressor load
≈$1,038/yr at defaults
The refrigeration ROI engine's default scenario (10 doors at 0.84 m², heated double-pane baseline, hybrid VIG, ΔT 40 K, 24 h/day, COP 2.5, $0.12/kWh, glass heater share 50%) returns ≈$1,038/yr combined conduction-plus-glass-heater savings and a ≈3.7-year payback; the linked calculator prices your door count and tariff.
Put numbers on your project
Model the same glazing decision for your own project — dimensions, climate, and rates in, project-specific savings out.
Technical Reading
Cold Storage Efficiency: The Hidden Cost of Poor Door Glazing
Quantifying compressor energy waste from high-U glass in walk-in coolers and freezers using ASHRAE Refrigeration 2022 load models (Ch. 24) — with real payback calculations.
Read the guideHVAC Savings From Vacuum Glass: The Peak-Load Math
How lower U-values cut HVAC tonnage and peak demand charges, with the sizing math and a worked peak-load example from the free THERMGLASS ROI engine.
Read the guideWhat Does Vacuum Glass Actually Cost? Payback Math
No sticker price fits every project — but the payback math does. What actually drives vacuum glass cost, the U-value-to-savings formula, and how building owners estimate payback honestly.
Read the guideSpecifying a similar project?
Talk to the engineering team about glazing your project.
Contact THERMGLASS